The MVWA will be allowed two (2) weeks for review of the as-builts.Hand drawn measurements or revisions will not be accepted. An exception may be made for the Contractor to measure the depth to buried infrastructure (refer to B.4).
All measurements are to be made by (or under the supervision of) the Surveyor or Engineer who will be certifying the project as constructed.
WHAT IS AN AS BUILT DRAWING PROFESSIONAL
The original set of the as-built construction documents must be stamped by a NYS licensed surveyor or a NYS licensed professional engineer.Prior to receiving water service, the Contractor shall deliver to the MVWA CAD files and certified copies of as-built surveys with all required revisions included as the final as-built survey.